Residential

Petra
  • 1 minute walking distance from Pon Vidyasaram School
  • 2 minute drive from Velachery MRTS
  • 2 kms from the Velachery Bus Terminus
  • 5 kms from the Medavakkam Junction
  • Adjacent to Pallikaranai Road near the Velachery flyover
BHK
Floors
Flat Name
Saleable Area
Basic Price
Floor plan
Status
1BHK
First
1 - A
902
Rs.4961000.00
Click to view floor plan
Sold
1BHK
First
1 - B
966
Rs.5313000.00
Click to view floor plan
Available
3BHK
Second
2 - C
1870
Rs.10285000.00
Click to view floor plan
Available
3BHK
Third
3 - D
1870
Rs.10285000.00
Click to view floor plan
Sold
  • 100% power back up
  • Water purification installation
  • Fitness room
  • Recreation area
  • Auto door elevator with ARD
  • Video door phone control access
  • Wi-Fi access
Flooring
  • Living/Dining/Common area/Bedroom/Kitchen: Vitrified tiles (size: 600 x 600mm)
  • Master bedroom: Laminated wooden floors
  • Utility/Balconies/Toilets: Anti-skid ceramic tiles

Wall tiles
  • Good quality glazed/ceramic tiles for wall dadoing in toilets, kitchen and utility

Wall finishes
  • Ceiling and internal walls will be plastered smooth and finished with distemper paint

Joinery
  • Main door: Hard-wood frame with flush door finished with French polish/melamine finish
  • Bedrooms and kitchen doors: Hard-wood frame with molded flush shutters and enamel paint finish
  • Toilets: Hard wood frame/PVC coated molded flush shutter with paint finish
  • Windows: UPVC frames and glazed sliding shutters with insect proof screens

Kitchen
  • Polished black granite counter top of area up to 32 sq feet
  • Single bowl, single drain stainless steel sink of approved make
  • Glazed tile dado up to 2 feet height above the counter top

Toilets
  • Glazed tile wall dado up to ceiling height
  • Provision for geyser and exhaust fan point
  • Plain soft-coloured sanitary ware of approved make
  • Chromium plated plumbing fixtures of Jaguar/equivalent brands

Electrical
  • Concealed wiring using PVC sheathed multi-strand copper wire of suitable gauge
  • Flush mounted modular switches and sockets with isolators
  • MCBs and ELCB mounted on individual distribution boxes for each apartment
 Schedule of Payment
 Amount in Percentage
 On issue of allotment letter  3%
 On execution of agreements  27%
 On commencement of foundation works  20%
 On casting of roof slab  20%
 On commencement of masonry works(brick/block)  10%
 On commencement of plastering works  10%
 On commencement of finishing works  7%
 On completion & against possession  3%
Architects: Elements Design
Close

EMI CALCULATOR

Close

Please enter your contact details to view the floor plans and availability